Training Coordinator, Industrial Paint Manufacturer
“The safety induction for new hires was handled smoothly. Elion brought their own AV equipment and kept the session engaging. We’re thinking of repeating this monthly.”

And Consulting Private Limited

And Consulting Private Limited
Partial discharge (PD) testing detects tiny electrical sparks inside insulation before they grow into a complete failure. Elion performs non-invasive PD testing on transformers, switchgear, and cables per IEC 60270, using advanced PD detection instruments, and delivers a report with severity assessment and repair recommendations — trusted since 2010 across 30,000+ audits.
Partial discharge is a small electrical spark that occurs within a gap, void, or defect in insulation — it doesn’t immediately disrupt equipment operation, but over time it degrades the insulation further, eventually leading to complete failure and unplanned outages. PD testing identifies these discharges early, before they cause costly downtime or safety incidents.
Partial Discharge (PD) Testing is a diagnostic technique used to detect early electrical breakdowns or weak points in insulation systems of high-voltage electrical equipment such as transformers, switchgear, cables, generators, and motors.
Partial discharges are tiny electrical sparks that occur within insulation defects before a complete failure happens. These tiny sparks may not immediately disrupt operation but over time can grow, weakening insulation and eventually leading to costly outages or catastrophic equipment failure.
PD Testing identifies and measures these microscopic discharges so you can address issues early — improving safety, reliability, and asset life.
Corona discharge — occurs at sharp points or edges in high-voltage equipment exposed to air.
Surface discharge — occurs along the surface of insulation due to contamination or tracking.
Internal discharge — occurs within voids or gaps inside solid insulation material.
| Parameter | Online PD Testing | Offline PD Testing |
|---|---|---|
| Equipment Status | Equipment remains energized and in normal operation | Equipment is de-energized and taken out of service |
| Best For | Routine condition monitoring and continuous asset health assessment | Detailed diagnostics, commissioning, and acceptance testing |
| Operational Disruption | No disruption to plant operations | Planned shutdown or maintenance outage required |
| Typical Use Cases | Substations, transformers, switchgear, cable systems, and other critical infrastructure that cannot be shut down | New equipment commissioning, post-repair verification, factory/site acceptance testing, and detailed fault investigation |
Partial discharge testing cost depends on: number and type of assets tested (transformers, switchgear, cables), voltage class of the equipment, whether testing is done online or offline, and site accessibility. Request a fixed-fee quote with your asset list.
Enhance your asset reliability and prevent unplanned outages with Elion’s expert Partial Discharge Testing services.
Request a Quote or contact us at [email protected].
“The safety induction for new hires was handled smoothly. Elion brought their own AV equipment and kept the session engaging. We’re thinking of repeating this monthly.”
“Good response from our team for the chemical spill drill and awareness session. We had a minor leak last year and this training was timely. They even explained the MSDS sheet details clearly.”
“Elion conducted ergonomics training for our office support staff. They gave tips that don’t need any budget—just posture, breaks, and seating angles. Everyone found it useful.”
“Warehouse safety training was organized at our distribution center. The module covered stacking, material flow, and emergency handling. One or two team leads found the content basic, but the newcomers appreciated it.”
“The hot work and gas cutting safety training helped us address some recent near-misses. Our fabrication contractors said it was the first time anyone explained why permits matter, not just how to fill them.”
“We held a training on ergonomics and workstation safety. Elion’s speaker had a practical approach—suggested small furniture changes and posture tips that didn’t cost much but helped our office staff.”
“Elion covered cold storage safety and ammonia handling well. Some of our technicians said it was the first time they understood how to respond to leaks. We may request them for a follow-up drill.”
“Our garment unit required machine safety awareness for new joiners. Elion kept it interactive and used visuals from our own plant, which the workers related to.”
“The crane and material handling training helped reduce near misses in our yard. The trainer also gave tips that were not in the slides, based on their field experience. That made a difference.”
“We requested a training module on emergency evacuation procedures. Elion included site-specific examples which helped. The mock drill later was well-coordinated too. Our fire wardens felt more confident after the session.”
Partial discharge is a small electrical spark that occurs within a gap or defect in insulation, without immediately causing complete failure — but it worsens over time if left undetected.
It’s a non-invasive test that detects and measures these discharges in transformers, switchgear, and cables, so degrading insulation can be found and addressed before it causes an outage.
To detect insulation defects early and prevent failures.
Transformers, GIS, AIS, HV cables, motors.
Testing during operation to monitor live discharges.
Defects in insulation, voids, sharp edges, contamination.
No, it is a non-destructive test.
Using coupling capacitors, sensors, and analyzers.
IEC 60270, IS 6209, IEEE 400.
Depend on equipment type and manufacturer guidelines.
PD Testing is commonly performed on:
Power Transformers
Cables & Terminations
Switchgear (Indoor & Outdoor)
Generator Stator Windings
Motors & Rotating Machines
Bushings, CTs, PTs, GIS, and HV connections
Before commissioning new electrical equipment
During routine preventive maintenance cycles
After lightning strikes or overvoltage events
When unusual noise, heat, or insulation deterioration is observed
Before insurance inspections or electrical audits
After long idle periods or extended service life
Partial discharge is a small electrical discharge that occurs within insulation voids or defects under high electric stress. Unlike a full breakdown, it doesn’t immediately short the system but gradually damages insulation over time.
Even small PD activity slowly erodes insulation material. Left unchecked, this erosion can lead to complete insulation failure — resulting in outages, fires, property damage, or equipment replacement costs.
We use advanced instruments such as PD detectors, acoustic sensors, and high-frequency measurement tools that capture electromagnetic and acoustic signals produced by partial discharges.
Yes. PD testing is non-destructive and performed under controlled conditions without harming your electrical equipment.
Testing can sometimes be done online while equipment is energized (for certain assets like transformers under load), but offline testing may require planned shutdown for detailed evaluation.
Elion’s partial discharge testing follows IEC 60270, the international standard for high-voltage partial discharge measurement techniques.
Yes — online PD testing is performed while equipment stays in service. Offline testing requires planned downtime and is used for more detailed diagnostic work.
Corona discharge, surface discharge, and internal discharge — see the “Types of Partial Discharge” section above for details on each.
This depends on asset criticality and age; many facilities include PD testing as part of an annual or biennial condition-monitoring programme, with more frequent testing for aging or high-value assets.
Elion provides a severity assessment and recommendations — ranging from continued monitoring for low-severity findings to repair or replacement guidance for high-severity discharges.
Transformers, switchgear, power cables, and other high-voltage insulated equipment.
No — it is a non-invasive measurement technique and does not affect equipment operation or condition.
A report with PD levels, discharge location and type, severity assessment, and actionable recommendations for follow-up.
Cost depends on the number and type of assets, voltage class, and whether testing is online or offline — request a fixed-fee quote with your asset list.
Fields marked with an asterisk (*) are required
Elion’s Mock Drill Training program is a systematic safety initiative that develops emergency response capabilities in manufacturing facilities. Manufacturing environments present significant safety risks, including potential equipment malfunctions, chemical exposures, and fire hazards, making comprehensive emergency preparedness essential for worker protection and operational continuity. The program utilizes simulation-based training to…
In the rapidly evolving landscape of information technology, the safety and security of personnel and infrastructure have become paramount. Elion, a leader in safety training and emergency preparedness, has taken significant strides in enhancing the safety protocols within IT parks through its comprehensive mock drill training programs. These drills are…
Risk assessment is a crucial process for any organization, as it helps to identify potential risks and hazards that could impact the business operations. By conducting a thorough risk assessment, businesses can proactively identify and mitigate potential threats, thereby reducing the likelihood of costly disruptions and ensuring the safety of…
Elion, a prominent player in the manufacturing sector, has long been committed to ensuring the safety and well-being of its employees. The company recognizes that a safe workplace is not only a legal obligation but also a moral imperative that fosters productivity and employee satisfaction. To this end, Elion has…
In an era where health and safety have become paramount, especially in educational institutions, Team Elion has emerged as a pivotal force in promoting a culture of safety on university campuses. Their comprehensive training programs are designed to equip students and staff with the necessary skills and knowledge to navigate…
Mohali, Punjab has emerged as a hub for call center operations in recent years, with a growing workforce dedicated to providing customer support and sales services to clients around the world. The call center industry in Mohali has seen significant growth due to the availability of a skilled workforce, cost-effective…
In the fast-paced world of agriculture, particularly in the realm of seed processing, safety training is paramount. Elion, a recognized leader in safety training and consultancy, recently undertook a significant initiative to enhance workplace safety across multiple locations of a global vegetable seeds company in India. The focus of this…
Gender-driven safety audits are a crucial tool in empowering women in the workplace. These audits are designed to specifically address the unique safety concerns and challenges that women face in their work environments. By conducting gender-driven safety audits, organizations can identify and address potential hazards and risks that may disproportionately…
As we embark on our journey together, we find ourselves at the heart of Team Elion, a dynamic group dedicated to excellence in our respective fields. Our team is not just a collection of individuals; we are a cohesive unit that thrives on collaboration, innovation, and a shared vision for…
Occupational Safety and Health Administration (OSHA) training requirements in India are essential for ensuring the safety and well-being of employees in the workplace. OSHA is a regulatory body that sets and enforces standards to ensure safe and healthy working conditions for employees. In India, OSHA training requirements are governed by…